From 📍 Toa Payoh MRT Station, Singapore to ➡️ Kembangan MRT Station, Malaysia

Get ready for a fun trip from UOB, Serangoon Viaduct, Serangoon, Singapore, Southeast, 534801, Singapore to Serdang Raya North, Jalan Utama, Serdang Raya, Seri Kembangan, Subang Jaya, Petaling, Selangor, 43300, Malaysia. This journey is great for friends or family who like taking turns driving or traveling together.

How far? Driving distance is 347.13 kilometers (215.70 miles)

How long? About 4 h 9 min by car

Do you have a question or comment? Join the Conversation Below!

Sky's the Limit - Direct Flight Distance is 305.73 km (189.97 miles)

Flight time: 1 h 5 m

You'll have all the details for your journey from the vibrant UOB, Serangoon Viaduct, Serangoon, Singapore, Southeast, 534801, Singapore to the energetic Serdang Raya North, Jalan Utama, Serdang Raya, Seri Kembangan, Subang Jaya, Petaling, Selangor, 43300, Malaysia, ensuring a smooth adventure ahead. Enjoy your trip! Travel options include Car, Public Transport, Flights, or any other preferred method.

Drive Cost Calculator - Toa Payoh MRT Station to Kembangan MRT Station

Miles: Kilometers:
Vehicle Mileage (MPG): Vehicle Mileage (L/100km):
Fuel Price (USD/gallon): Fuel Price (EUR/litre):
Fuel Usage (gallons): Fuel Usage (litres):
Cost One-way (USD): Cost One-way (EUR):
Cost Round Trip (USD): Cost Round Trip (EUR):

Directions from Toa Payoh MRT Station, Singapore to Kembangan MRT Station, Malaysia

Toa Payoh MRT Station, Singapore

Geographical Coordinates (D° M' S") 1° 20' 58.738" N
103° 52' 24.991" E
Latitude 1.3496495
Longitude 103.8736087

Kembangan MRT Station, Malaysia

Geographical Coordinates (D° M' S") 3° 2' 30.876" N
101° 42' 17.799" E
Latitude 3.0419099000000003
Longitude 101.70494405757375




We'd Love to Hear from You!

Your thoughts and insights are important to us. Be the first to share your comments on this topic!

From Toa Payoh MRT Station

From Kembangan MRT Station